What are you looking for?
K35. Identify laws, regulations and standards in the field of industrial organization engineering.
S16. Apply environmental technologies and the principles and objectives of sustainable development in industrial and human development and in environmental protection.
S34. Use specifications, regulations and standards in the field of industrial organization engineering.
S35. Detect, propose, analyze, model, make decisions and solve problems in the social, economic and environmental fields.
S36. Use tools and technologies to intervene in the direction of sustainability.
S37. Develop environmentally friendly technology and integrate it into engineering work.
S42. Apply specifications, laws, regulations and standards in the field of industrial organization engineering.
C2. Apply sustainability criteria and the profession's codes of ethics.
C3. Manage projects in the field of industrial organization engineering.
C7. Write texts with a structure appropriate to the communication objectives.
C11. Operate appropriately to understand and elaborate a text in written, oral or audiovisual form and interpret and understand the plurilingual, multilingual and intercultural relationship of their immediate reality.
C28. Contribute to developing interdisciplinary and transdisciplinary teams, recognizing and respecting different visions and areas of knowledge, integrating them towards a common goal.
C37. Evaluate inequalities based on sex and gender to design effective solutions applied to their professional field and/or sphere of influence.
The Project Management II subject is designed to train participants to carry out engineering projects, both in the processes of developing the technical solution and in the management of the different phases of the project. This subject studies the final phases of the life cycle of an engineering project, specifically detailed engineering and project execution. In addition to the theoretical contents studied, students develop an industrial project in a group, based on the preliminary project developed in the Project Management I subject of the third year. Additionally, the basic aspects of managing an engineering project office are analyzed.
The classroom in which the subject is taught (physically or virtually) is a safe space, free of sexist, racist, homophobic, transphobic and discriminatory attitudes, whether towards students or teachers. We trust that together we can create a safe space where we can make mistakes and learn without having to suffer prejudice from others.
Topic 1: Closure of basic engineering.
Topic 2: Advanced project planning.
Topic 3: Development of detailed engineering.
Topic 4: Execution and control.
Topic 5: Technical office II.
The final grade is the weighted sum of the grades of the following activities:
Activity 1 - Buffer memory: 10%
Activity 2 - MS Project programming practice: 10%
Activity 3 - Validations: 10%
Activity 4 - Final report: 20%
Activity 5 - Final exam: 50%
The final grade for the subject is the weighted sum of the grades for the activities if the grade for activity 5 is greater than or equal to 4,0 points out of 10, otherwise, the final grade will be that of activity 5.
Attendance at theoretical and laboratory sessions, and submission of the corresponding reports for activities 1 and 4 is a necessary condition for the evaluation of the subject.
The grade for activity 1 is cumulative to activity 4, therefore your grade may vary when you submit the subsequent activity.
Although some activities are delivered in groups, their evaluation will be individual.
It will be up to the teachers of the subject to decide on the possibility of adding activities that allow the recovery of the suspended activities.
The retake exam replaces activity 5.
The retake exam only gives the option to pass the subject, at most, with a grade of 5, except in the case where the weighted average grade of the first 4 activities is equal to or greater than 8. In this case, the final grade will correspond to the weighted average grade of all the activities of the subject (the retake exam corresponds to activity 5, and its grade must be greater than or equal to 4,0). If the grade of the retake exam is lower than 4 out of 10, the grade of the retake exam will directly be the grade of the subject.
The identification of plagiarism is considered a serious circumstance that results in a failing grade in the subject.
IA: Use without limitations. This resource can be used freely without any type of restriction on the activity. However, it is mandatory to cite and reference its use.
For other aspects, the "Regulations for the evaluation of undergraduate courses at the TecnoCampus University Center" will be strictly followed.
GIMÉNEZ, Miquel (2026). Materials for the Project Management II subject. TecnoCampus. Mataró
HORINE, Gregory. (2010). Project management. Anaya.
PROJECT MANAGEMENT INSTITUTE. PMBOK (2013). Guide to the Fundamentals of Project Management.
BURTON, Celia; MICHAEL, Norma (1992). A practical Guide to Project Management. Kogan Page. London.
CASTRO, Manuel; COLMENAR, Antonio; CRUZ, Francisco Javier.; SANCRISTOBAL, Elio. (2010). Project Management with Microsoft Project 2010. Ra-ma.
DÍAZ MARÍN, Ángel. (2010). The art of project management. Ra-ma
DAVENPORT, Thomas.; PRUSAK, Laurence. (1998). Working Knowledge: How organizations manage what they know. Harvard Business School Press.
KREZNER, Harold (2017). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. (12th edition). WILEY.
ROSENAU, Milton (1998). Successful Project Management: a step-by-step approach with practical examples. 3rd Edition. John Wiley.
WYSOCKY, Robert (2014). Effective Project Management: Traditional, Agile, Extreme (7th edition). WILEY.